• captainlezbian@lemmy.world
    link
    fedilink
    arrow-up
    5
    ·
    6 months ago

    Yeah I don’t hire tradesfolk thinking I’m getting something cheap. I hire tradesfolk thinking I’m getting something that’s gonna fucking work when I need it to for as long as it can be expected to. That weld ain’t the cheapest part of the bridge by any means but it cannot unexpected fail without catastrophe, so if trained and reputable welders are expensive then welds on that bridge is expensive.

    I can run my own wires when the wife lets me. But I won’t because that expensive electrician will do it safely and in a way that doesn’t cause even more expensive problems in the future

    Good labor isn’t cheap and cheap labor is rarely good.